多级泵站接力排水自适应调度优化研究

    Research on Adaptive Scheduling Optimization of Multi-level Pumping Station Relay Drainage

    • 摘要: 针对多级泵站接力排水系统调度优化难题,建立以电费最小为目标、启停次数为惩罚项的多目标优化模型,分析了分时电价下级间联合错峰接力排水策略,探讨了基于深度Q网络的联合错峰接力排水自适应调度,并以某四级泵站接力排水系统工程为例,开展联合错峰接力排水自适应调度工程效果验证与分析。

       

      Abstract: Aiming at the scheduling optimization challenges of multi-level pumping station relay drainage systems, it formulates a multi-objective optimization model that minimizes total electricity prices while penalizing frequent start-stop cycles. It analyzes a coordinated off-peak relay drainage strategy under time-of-use electricity price and explores an adaptive scheduling framework based on deep Q network. The proposed adaptive scheduling strategy for coordinated off-peak relay drainage is validated and analyzed through a case study of a Level-4 pumping station relay drainage system project.

       

    /

    返回文章
    返回