新建燃气隧道上跨既有盾构隧道施工安全分析

    Analysis on the Construction Safety of a Newly-built Gas Tunnel Over-passing Existing Shield Tunnel

    • 摘要: 针对小净距上跨隧道的近接施工易因卸载效应引发安全事故问题, 以小净距上跨既有盾构隧道的某新建燃气隧道工程为研究对象, 采用Midas GTS NX建立三维数值模型, 分析新建燃气隧道施工对既有盾构隧道结构位移、应力变化的影响, 并对受施工影响的既有盾构隧道段开展位移、变形监测。模拟结果与现场监测结果对比分析表明, 实测数据基本小于数值模拟结果, 且位移值远低于安全控制标准, 即既有盾构隧道在施工扰动下结构安全可控。

       

      Abstract: Aiming at the issue that safety accidents are prone to occur during the close-proximity construction of small clear distance over-passing tunnels due to the unloading effect, it focuses on a newly-built gas tunnel project of over-passing existing shield tunnel. A three-dimensional numerical model is established using Midas GTS NX to analyze the influence of the newly-built gas tunnel construction on the structural displacement and stress changes of the existing shield tunnel. Additionally, displacement and deformation monitoring is carried out on the section of the existing shield tunnel affected by the construction. The comparative analysis of the simulation results and on-site monitoring data shows that the measured values are generally lower than the numerical simulation results, and the displacement values are far below the safety control criteria. It indicates that the structure of the existing shield tunnel remains safe and controllable under construction disturbances.

       

    /

    返回文章
    返回