引黄济宁工程岩塞爆破式取水口方案设计研究

    Research on Design of the Rock-Plug Blasting Water Intake Scheme for the Yellow River Diversion to Xining Project

    • 摘要: 青海省引黄济宁工程从龙羊峡水库取水, 水库水位较高, 库区地形地质条件复杂, 其取水口设计的合理性直接关系到工程的供水安全。根据龙羊峡水库的地形地质条件和周边环境, 选取了取水口位置, 经综合对比, 选择"水下开挖+岩塞爆破"的施工方案, 并对岩塞和聚渣坑进行具体设计, 分析了关键施工技术和生态保护及安全保障措施。

       

      Abstract: The Yellow River Diversion to Xining Project abstracts water from the Longyangxia Reservoir, which features high water levels and complex topographic and geological conditions. The design of the water intake structure is critical to ensuring the water supply security of the project. Based on the reservoir's topographic and geological conditions and surrounding environment, a suitable location for the water intake was selected. After comprehensive comparison, a construction scheme involving "Underwater excavation+Rock-plug blasting" was adopted. Detailed designs for the rock-plug and slag collection pit were developed, and key construction techniques, ecological protection measures, and safety assurance protocols were analyzed.

       

    /

    返回文章
    返回