我国水电站泄洪消能措施现状与展望

    The Present Status and Future of Energy Dissipation Measures in Chinese Hydroelectric Power Station

    • 摘要: 我国水电站泄洪消能措施研究进展和在工程上应用的典型实例,揭示了不同的泄流条件采用不同的消能方式及其特点,以供水电站泄洪消能设计借鉴。在工程实际中,由于坝址处的地形、地质条件,坝型的差异及水文条件的不同,消能方案和枢纽的泄洪整体布置也不尽相同,必须通过模型试验研究,有条件时还需做原型验证来研究,才能达到泄洪消能的最佳效果。

       

      Abstract: The text summarizes the researches and practices of energy dissipation measures in hydroelectric power station,introduces different energy dissipation measures in different discharges and its characteristics.It may be a reference to the design in engineering.But it must be pointed out that in practice,because of the different landforms,geological conditions,different dam figures and hydrological conditions,energy dissipation measures and its disposal are different,too.In order to get the best results,it must be tested on model experiments,and if the situation permits,it can be tested on prototype.

       

    /